31.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Wall masonry with ceramic block is underway in Block A. Reinforcement of the 2nd stage of vertical structures is underway in Block B. Earthworks – in block C. Reinforcement of the foundation of the infrastructure building is in progress.