25.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Concreting of the infrastructure building foundation preparation has been carried out. Geodetic surveying of construction axes and block laying on the floors is underway in Block A. In Block B, formwork installation of the 1st stage of vertical structures and reinforcement of the 2nd stage of the foundation slab is in progress. Excavation works are being carried out in Block C.