14.12.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, reinforcement of the floor slab of the 3rd floor continues in the first half, concreting of the floor slab of the 3rd floor is carried out in the second half. Excavation works are underway in Block B. In Block E, the laying of the parapet with ceramic block is in progress.