11.12.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Installation of formwork for the floor slab of the 19th construction (18th hotel) floor has been completed. Reinforcement of the slab has been started. Wall masonry on the 11th (10) floor is in progress.