09.12.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A: in the first half the formwork for the floor slab of the 3rd floor is being installed, in the second half the formwork for the floor slab above the 3rd floor is being installed. Block B: excavation works are in progress Block E: installation of lighting.