07.11.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Dismantling of the formwork on the 15th construction (14 hotel) floor. Preparation for the installation of the floor slab formwork on the 18th construction (17 hotel) floor. Ceramic block wall masonry on the 8th (7) floor.