05.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, dismantling of the floor slab formwork is in progress. In Block B, installation of the foundation slab formwork. In block C – excavation works. In Block E – ceramic block wall masonry and staircase formwork installation.